ACCIONA

ALSTOM

IBM GLOBAL SERVICES

BOSÉ

CANAL DE COMUNICACIONES UNIDAS
CANAL DE ISABEL II
CENTROPLAN
COLEGIO RUNNYMEDE

CORSAN CORVIAM

EMTE

FCC

FERROVIAL

FOMENTO ENERGÍAS RENOVABLES

GRUCONSA

IBERDROLA

INDRA

ORANGE
PHOENIX

MOPU

SANTA BÁRBARA SISTEMAS

SOLARIA

SEMI
SICE
SPEIDEL
TECNOMA

TELEFÓNICA SISTEMAS

TYPSA

UNION FENOSA

VODAFONE
OBRA CIVIL EN PLANTA FOTOVOLTAICA


 

 

 

 

 



Voice, data and electricity installations

Technical rooms at national level

Maintenance of voice and data networks
Organisation and re-planning of works

 

Palacio de los Deportes de la Comunidad de Madrid

Loudspeaker installation

 

back to index

Alcobendas Sports Centre, Madrid

Lighting, lighting control and acclimatisation. Low and Medium Voltage

     
           
Hotel and offices in Moscatelares Complex in San Sebastián de los Reyes, Madrid

Lighting, lighting control and acclimatisation. Low and medium voltage

 
Retevisión, Navacerrada, Madrid

Transformation centre

 
Real Café, Estadio Santiago Bernabéu, Madrid

Transformation centre

     
         

back to index

Fiber Optics sites at national level

Fiber optics unions and assembly of sites

 

back to index

 

 

back to index

Medium Voltage Line in Burgos

Medium Voltage line, 2 Km.

 

back to index

EROSKI Center, Toledo

Installation of BT, MT, acclimatisation control and lighting

 

back to index

Fiber Optics Link in Paseo de Melancólicos, Madrid

Fiber optics link. Civil works and telecommunications

 
Replanning of fiber in Iberdrola substations in the CAM

Fiber re-planning, Autonomous Community of Madrid (CAM)

   

back to index

Ribadesella and Villaviciosa Tunnels

Engineering, works management and execution of installations of AT, BT, ventilation, signalling and communications in 1.5 km.

Entry and exit lighting of the tunnels by means of lamps, as well as the lighting of the Caravia - Llovio and Villaviciosa and Fabares sections

 

back to index

Toledo Education Regional Ministry

Installation of a structure cabling network

Eurostars 4* Hotel in Paseo de San Eugenio, Toledo

Complete installation of electricity and communications

   
Call Center Vodafone, Toledo

Installation of structured network cable

back to index

 

   

back to index

Santiago Bernabeu Stadium

Installation of loudspeakers

     
           

back to index

Showroom in Campo de las Naciones

Electric and communications installations

back to index

Complete installation of the voice and data network with structured cabling at national level

back to index

Voice and data corporate building in Avda. de San Luis, Madrid

back to index

Civil works in Photovoltaic Installations
     

back to index

Photovoltaic installation 6 MW connected to MT, in La Solana (Ciudad Real)
   

Photovoltaic installation 2 MW connected to MT, in Jumilla (Murcia) 

Photovoltaic installation 1,3 MW connected to MT, in Miguelturra (Ciudad Real)
 

Photovoltaic installation 1 MW connected to MT, in Puertollano (Ciudad Real)
 

Photovoltaic installation 1 MW connected to MT, in Pozuelo de Calatrava (Ciudad Real)
 

Photovoltaic installation 100 kW in Guadalajara
 

Photovoltaic installation 100 KW connected to BT, in Martos (Jaen)
 

Photovoltaic installation 15 KW connected to BT, in Móstoles (Madrid)
 

Photovoltaic installation 5 KW connected to BT, above roof in San Sebastián de los Reyes (Madrid)
   

Photovoltaic installation 1 MW connected to MT, in Jarafuel (Valencia)
   

Photovoltaic installation 5 MW connected to MT, in Villanueva de la Jara (Cuenca)
     

Photovoltaic installation 5 MW connected to MT, in San Clemente (Cuenca)
   

Fuel cells installation
     

Fuel cells installation
     

 

 
     
 